The team

In case you are wondering who was actually doing the work, here is the composition of the construction team.

My general contractor is a hands-on guy who can do pretty much anything. He has a permanent team of 2-3 guys and a few semi-permanent helpers. They handled:

  • Paper work
  • Inspections
  • Site preparation
  • Preparation for the foundation
  • Framing (walls, roof trusses)
  • Doors
  • Windows
  • Insulation
  • Floors
  • Kitchen cabinets
  • Bathroom cabinets
  • Shower door
  • Painting (inside and outside)
  • Drain lines
  • Fence
  • Miscellaneous (closets, TV nook, etc)

For specific jobs that required particular skills or had to be done faster, the general contractor hired subcontractors who did the following:

  • Foundation (concrete)
  • Roof
  • Stucco
  • Drywall
  • Electrical
  • Plumbing
  • Countertops
  • HVAC
  • Tile
  • Concrete (around the house)