Frame, roof, windows
After the foundation was done, framing started (and was finished in less than a week).
Then came the plywood (on the exterior walls).
Then came the roof. The roof trusses came already pre-assembled, so they only had to be installed. Because there was not enough clearance for the crane, that was a hand-and-shoulder job. A heckova hand-and-shoulder job.
Finally, the windows were put in and the inside of the house was pretty much protected from the rain.
Speaking of which...
NEXT: RAIN OR SHINE
PREVIOUS: THE TEAM
FIRST: INTRODUCTION
Comments
Post a Comment