Frame, roof, windows

After the foundation was done, framing started (and was finished in less than a week).

Then came the plywood (on the exterior walls).

Then came the roof. The roof trusses came already pre-assembled, so they only had to be installed. Because there was not enough clearance for the crane, that was a hand-and-shoulder job. A heckova hand-and-shoulder job.

Finally, the windows were put in and the inside of the house was pretty much protected from the rain.

Speaking of which...